M
Q. The minimum demand on a power station is 10 MW. If the annular load factor is 40%, total evergy generated per year will be
Be the first to start discuss.
Related MCQs
Q. soot is virtually nothing but
Q. The Knudsen diffusivity is dependent on the
Q. The rotor injection method is a part of the slip changing technique.
Q. The term 'critical' is associated with which type of power plant?
Q. Lead screens improve mainly the of the final radiograph:
Discusssion
Login to discuss.