M

Mr. Dubey • 52.77K Points
Coach

Q. Cost required for developing the right product by right method at the first time is called as:

(A) cost of manufacturing
(B) cost of quality
(C) cost of prevention
(D) cost of failure
Share

No solution found for this question.
Add Solution and get +2 points.

You must be Logged in to update hint/solution

Discusssion

Login to discuss.

Be the first to start discuss.


Question analytics