Home / Engineering / Advance Construction and Equipments / Question
Y
Q.) the ______ is made of steel sheet piles and this type of cofferdam is proved successful in unwatering large areas.
Related MCQs on Advance Construction and Equipments
Q. The main advantage of line organisation is:
Q. The cone test is useful in determining the bearing capacity of
Q. Re-entrant or Borda's mouthpiece is an
Q. The ratio of the length to breadth of a wooden float, is
Q. It is found that a moisture content of about ______ is appropriate for the timber formwork.
Q. The height of the parapet wall is usually kept as
Q. When two column loads are unequal, which of the possible footing can be provided?
Q. In time-cost optimization of a project, crashing is done.
Discusssion
Login to discuss.