M
Q. A parapet well is usually constructed on the
Be the first to start discuss.
Related MCQs
Q. For a floating body to be in equilibrium
Q. In which of the following contract; contractor is quickly be agreed and work on job?
Q. A centrifugal pump should be so installed above the water level in the sump such that
Q. The maximum spacing of the under-reamed pile should not normally exceed
Q. Bulking of sand is maximum if moisture content is about
Q. An opening in a tank or vessel through which the liquid flows out is known as
Q. The pressure measured with the help of a piezometer tube is in
Discusssion
Login to discuss.