R
Q. A canal head work in rocky stage of a river is not suitable because ?
Be the first to start discuss.
Related MCQs
Q. Two theodolite method of setting out a curve involves ?
Q. To ensure constant moisture content in aggregates
Q. The error in measured length due to incorrect holding of chain is ?
Q. “Post monsoon maintenance is carried out before monsoon”, is it true or false?
Q. Which one is used for the transporting the concrete?
Q. The arbitrary mix method, the coarse aggregates are taken twice the fine aggregates.
Q. The viscosity of water is __________ than that of mercury.
Discusssion
Login to discuss.