R
Q. The formula, F = R - K(1.8T + 32) for obtaining the annual run-off is known as ?
No solution found for this question.
Add Solution and get +2 points.
You must be Logged in to update hint/solution
Be the first to start discuss.
Related MCQs
Q. “Lower surface of the brick or stone is known as bed.” is it true or false?
Q. After the curing of 28 days, the concrete gains strength upto ?
Q. The beam outside a wall upto floor level above it, is known as
Q. Exposure to SO2 containing chimney gases results in the
Q. The number of bags of cement required per cubic metre of 1 ; 2 ; 4 concrete will be approximately
Q. Septic action is produced by the septic tank by __________
Q. As per IRC recommendations, traffic volume study is carried out for rural roads for
Question analytics

Discusssion
Login to discuss.