R
Q. The longitudinal space between the effective length of intermittent butt welds is taken not more than ?
Be the first to start discuss.
Related MCQs
Q. The quantity of stone ballast required per metre tangent length for broad gauge is mm ?
Q. The standard sand now used in India is obtained from
Q. Modular co-ordination of construction means proper
Q. The aggregate is said to be flaky when ?
Q. For walls less than 6 m in height, the thickness of the retaining wall at the bottom is equal to
Q. In voids method of determining the quantity of cement paste, it is assumed that the
Q. The important type of axial flow reaction turbines are
Q. Simple hand operating pump is also called as
Q. The soundness of cement is tested by ?
Q. Which factors affect the selection of the construction equipment?
Discusssion
Login to discuss.