M
Q. The temporary casing is known as the ______
Be the first to start discuss.
Related MCQs
Q. Which of the following is the correct sequence of the parts of a canal system ?
Q. A combined footing is provided when the ?
Q. A flow net is used to determine the ?
Q. An Assistant Engineer may have powers upto rupees ?
Q. Which of the following objective is not for SPC.
Q. The construction joints in cement concrete ?
Q. have the highest vane angle at inlet (β1 value)?
Q. The test conducted in the laboratory on the specimen made out of trial concrete mix is called
Q. As compared to ordinary Portland cement, use of pozzolana cement
Discusssion
Login to discuss.