M
Q. Vertical sides of columns may be stripped after
Loading Comments....
Related MCQs
Q. The gap or margin of height, between full supply level (F.S.L.) and top of the bank is called ?
Q. In the seismic refraction method, the waves sent along the ground surface is picked by
Q. The rate of differential settlement is defined by which of the following equation?
Q. The bracing provided in the plane of end posts is called
Q. For high degree of workability, the slump value should vary between ?
Q. The process of loosing water from the leaves of plants, is termed as ?
Discusssion
Login to discuss.