M
Q. A mix with water-cement ratio of 0.78 is termed as wet mix.
Be the first to start discuss.
Related MCQs
Q. The hazard with concerns damage or destruction of building itself is known as the __________
Q. In the above question, if the angular velocity ? is doubled, then the depth of parabola will be
Q. The layers such as sand and gravel which allow the water to pass through them are known as ?
Q. The salient feature of functional organisation is
Q. A flow whose streamline is represented by a straight line, is called
Q. Super-elevation should not be
Q. For ventilation Which action is required?
Q. The neutral stress on the soil is due to the ?
Q. Preliminary project report for a road project must contain
Discusssion
Login to discuss.