M
Q. Normally pre-stressing wires are arranged in the
No solution found for this question.
Add Solution and get +2 points.
You must be Logged in to update hint/solution
Be the first to start discuss.
Related MCQs
Q. For undeveloped areas, the type of gauge adopted is ?
Q. The central part of a tree is called ?
Q. The object of introducing a transition curve at each end of the circular curve is ?
Q. An average length of a pace is ?
Q. In making precast structural units for partition and wall lining purposes, the concrete should be
Q. Kinematic similarity is said to exist between the model and the prototype, if both of them
Q. Super-fluous water is also called ?
Question analytics

Discusssion
Login to discuss.