Q. While filling the tender for any work, the contractor considers
Be the first to start discuss.
Related MCQs
Q. Removal of props under beams and arches spanning upto 6 m
Q. An analysis of the condition of complete bearing capacity failure is usually termed as
Q. For steel members not exposed to weather, the thickness of steel should not be less than
Q. The usual proportion of ingredients in reinforced cement concrete is
Q. The 254 mm side of a plate sleeper is ?
Q. The optimistic time represents ?
Q. The head available at the inlet of the turbine is known as net or effective head.
Q. The roads connecting capital cities of states is called ?