M
Q. Assertion (A): Activity 57 is critical. Reason (R): Earliest finish time and latest finish time for events 57 are same Select the correct answer.
Be the first to start discuss.
Related MCQs
Q. Which factor does not affect the selection of drilling pattern?
Q. Pneumatic structure contains:
Q. The design criterion for the summit curves is the sight distance to be allowed on the highway.
Q. Steel tanks are mainly designed for
Q. The theoretical velocity of jet at vena contracta is (where H = Head of water at vena contracta)
Q. The commonly used geophysical method for site exploration is
Q. A soil having uniformity co-efficient more than 10, is called ?
Q. The maximum permissible colour for domestic supplies, on platinum cobalt scale is ?
Discusssion
Login to discuss.