M
Q. For the supply of materials for concrete, form work reinforcing and placing of concrete, removal of form work and curing of concrete, number of bar(s) required on bar chart, is
Be the first to start discuss.
Related MCQs
Q. The flow net in the seepage of water through a soil medium is a network of ?
Q. The side drains are provided on both sides of the roadway, when the road is
Q. Kaolin is chemically classified as: ?
Q. The durability of concrete is proportional to ?
Q. Normally………….. gypsum is used in concrete.
Q. Class-9 roads are designed to carry ?
Q. The Indian Roads and Transport Development Association (I.R.T.D.A.) was set up in
Q. An aggregate which may contain some moisture in the pores but having dry surface is known as
Discusssion
Login to discuss.