M
Q. For the supply of materials for concrete, form work reinforcing and placing of concrete, removal of form work and curing of concrete, number of bar(s) required on bar chart, is
No solution found for this question.
Add Solution and get +2 points.
You must be Logged in to update hint/solution
Be the first to start discuss.
Related MCQs
Q. ................is provided to safeguard scaffolding against overturning.
Q. Weight batching is done by ?
Q. Why sand island method of sinking of caisson is used?
Q. Concrete is unsuitable for compaction by a vibrator if it is
Q. The dog spikes are used for fixing rail to the ?
Q. When a reinforced concrete structure is loaded, the resistance first broken is ?
Q. The property of a liquid which enables into resist tensile stress is called its surface tension.
Q. The vertical downward movement of the base of the structure is called
Question analytics

Discusssion
Login to discuss.