M
Q. Consider the following statements: In the bar chart planning 1. Interdependence of the operations cannot be portrayed. 2. Progress of work can be measured. 3. Spare time of the activities can be determined. 4. Schedule cannot be updated. Of these statements
No solution found for this question.
Add Solution and get +2 points.
You must be Logged in to update hint/solution
Be the first to start discuss.
Related MCQs
Q. For purely cohesive soil, local shear failure may be assumed to occur when the soil is
Q. The workability of concrete can be improved by adding ?
Q. Which material used for the chimney lining?
Q. Which of the following serious problems arise from cavitation?
Q. The concrete in which preliminary tests are performed for designing the mix is called
Q. Advantage of a clamp compared to a kiln for burning bricks is that
Q. On wetting, cohesive soils,
Q. The plastic limit exists in ?
Q. The city roads which are meant for through traffic usually on a continuous route are known as
Q. Which are the sickness that cannot arise due to working in pneumatic caisson?
Question analytics

Discusssion
Login to discuss.