M
Q. The process of incorporating changes and rescheduling or replanning is called
Be the first to start discuss.
Related MCQs
Q. Which one is the method of placing concrete under water?
Q. The most economical section of a lined canal is ?
Q. For hypersonic flow, the Mach number is
Q. The density of a liquid in kg / m3 is numerically equal to its specific gravity.
Q. The effective length of fillet weld should not be less than ?
Q. Which of part of internal vibrator generates a vibration?
Q. Number of rivets required in a joint, is
Q. According to IS: 4561978, the flexural strength of concrete is
Q. Braking jet in an impulse turbine is used ?
Q. The flow of rail metal due to abnormally heavy loads is called ?
Discusssion
Login to discuss.