M
Q. The process of incorporating changes and rescheduling or replanning is called
Be the first to start discuss.
Related MCQs
Q. In flat slabs, the width of column strip, where drops are not used, is taken as ?
Q. the precast concrete piles are generally used for a maximum design load of about _______.
Q. The formula, F = R - K(1.8T + 32) for obtaining the annual run-off is known as ?
Q. A combined trapezoidal footing for two columns becomes essential ?
Q. The door / window frame should have ______ horn at the upper side.
Q. An error of 1% in measuring head over the apex of the notch (H) will produce an error of
Q. Thickness of mortar joint in coursed rubble masonry is…..
Q. To achieve desirable product quality, Taguchi recommends which process?
Discusssion
Login to discuss.