M
Q. Which of the following is not a principle of preparing job layout
Be the first to start discuss.
Related MCQs
Q. Negative skin friction on piles
Q. Which of the following statement is correct ?
Q. Rise of water table above the ground surface causes
Q. An error of 1% in measureing head over the crest of the notch (H) will produce an error of
Q. The discharge over a triangular notch is
Q. For highly loaded columns, the concrete mix used is of proportion
Q. The expansion in Portland cement can be tested by ?
Q. The design period for a water supply project is taken as ?
Q. During seepage through a soil, direction of seepage is always
Discusssion
Login to discuss.