M
Q. Full width of road should be taken for bituminous work at a time so that job is completed in time.
Be the first to start discuss.
Related MCQs
Q. The fillet in a rail section is provided to ?
Q. in ______ method, it is assumed that a property loses its value by the same amount every year.
Q. The coefficient of volume compressibility is ?
Q. Coefficient of consolidation of a soil is affected by
Q. Lacey gave a relation between ?
Q. National Highways Act, 1956 came into force from ?
Q. A groyne with a curved head is known as ?
Q. The cone resistance qc, for sandy silt type of soil is
Q. After 28 days of curing, cement gains have been found to have hydrated to a depth of only…..u.
Discusssion
Login to discuss.