R
Q. It is necessary to consult the following while drawing up requirement specification
Correct Answer - Option(D)
Share
Be the first to start discuss.
Related Posts
Q. Which of the following does not occur in phase - 4 of the system development life cycle (SDLC)
Q. System test plan is specified
Q. An appraisal, of a system's performance after it has been installed, is called system
Q. The code used for the validation purpose is known
Q. In data-flow diagrams, an originator or receiver of the data is usually designated by
Q. A graphic representation of an information system is called
Discusssion
Login to discuss.