Q. A group of workers was put on a job. From second day onwards, one worker was withdrawn each day. The job was finished when the last worker was withdrawn. Had no worker been withdrawn at any stage, the group would have finished the job in 55% of the time. How many workers were there in the group?
No solution found for this question.
Add Solution and get +2 points.
You must be Logged in to update hint/solution
Q. How many times in a day (24 Hrs) are the hands of a clock coincide ?
Q. The least perfect square which is divisible by each of 21, 36 and 66 is = ?
Q. Among how many children may 429 mangoes and also 715 oranges be equally divided?
Q. Which of the following fraction is greater than 3/4 but less than 5/6 ?
Q. If the product of two numbers is 324 and their HCF is 3, then their LCM will be = ?
Discusssion
Login to discuss.