Q. 31) the ______ was used as a material for the construction of caisson in the early stages of development of caisson.
Y
Q. 32) a _____ caisson is open at top and closed at bottom.
Y
Q. 33) a ______ is a caisson which is open at top as well as at bottom.
Y
Q. 34) a _____ are open at bottom and closed at top.
Y
Q. 35) which the given method is used for dewatering of the foundation trenches.
Y
Q. 36) in case of releasing artesian pressure, which precaution should be taken when the system of well points is adopted.
Y
Q. 37) the organic chemicals include epoxy resin, polyester resin and other resins are used in which method of dewatering of the foundation trenches.
Y
Q. 38) from given below, which method for the dewatering of foundation trenches is portable and can be easily moved when required.
Y
Q. 39) in which method a refrigeration plan of required capacity is need to be installed near the site of work.
Y
Q. 40) ______ process consists of making a number of holes in the ground and then filling these holes by the cement grout under pressure
Explore Sets
Advance Construction and Equipments MCQs Set 1
Advance Construction and Equipments MCQs Set 2
Advance Construction and Equipments MCQs Set 3
Advance Construction and Equipments MCQs Set 4
Advance Construction and Equipments MCQs Set 5
Advance Construction and Equipments MCQs Set 6
Advance Construction and Equipments MCQs Set 7
Advance Construction and Equipments MCQs Set 8
Explore More Categories
Click on category to learn MCQs of that category.Electronics and Communication Engineering