Q. The chart which gives an estimate about the amount of materials handling between various work stations stations is known as ?

(A) flow chart
(B) time chart
(C) travel chart
(D) operation chart
View Answer Discuss Share

V

Vikash Gupta • 33.56K Points
Instructor I

Q. The occurrence of the completion of an activity, is called its ?

(A) head event
(B) tail event
(C) dual role event
(D) none of these
View Answer Discuss Share

V

Vikash Gupta • 33.56K Points
Instructor I

Q. CPM is ?

(A) activity oriented
(B) event oriented
(C) time oriented
(D) resource oriented
View Answer Discuss Share

K

Kiran Rapria • 4.26K Points
Extraordinary

Q. The optimistic time represents ?

(A) shortest possible time in which an activity can be completed if everything goes exceptionally well
(B) time in which the activity is normally expected to complete under normal contingencis
(C) time in which an activity will take to complete in case of difficulty
(D) none of the above
View Answer Discuss Share

V

Vijay Sangwan • 28.62K Points
Instructor II

Q. The difference between the total float and free float is called ?

(A) duration
(B) interfering float
(C) critical activity
(D) none of these
View Answer Discuss Share

R

Ranjeet • 34.60K Points
Instructor I

Q. In the critical path of construction planning, free float can be ?

(A) greater than total float
(B) equal to total float
(C) greater than independent float
(D) less than independent float
View Answer Discuss Share

A

Admin • 36.96K Points
Coach

Q. When float or slack of an activity is positive ?

(A) it represents a situation where extra resources are available and the completion of project is not delayed
(B) it represents that a programme falls behind schedule and additional resources are required to complete the project in time
(C) the activity is critical and any delay in its performance will delay the completion of whole project
(D) any one of the above
View Answer Discuss Share

N

Neelam Mittal • 4.57K Points
Extraordinary

Q. The time in which an activity will take to complete in case of difficulty, is called ?

(A) optimistic time
(B) most likely time
(C) pessimistic time
(D) none of these
View Answer Discuss Share

V

Vijay Sangwan • 28.62K Points
Instructor II

Q. An activity requires ?

(A) events
(B) resources
(C) time and resources
(D) energy
View Answer Discuss Share

A

Admin • 36.96K Points
Coach

Q. PERT analysis is based ?

(A) optimistic time
(B) pessimistic time
(C) most likely time
(D) all of these
View Answer Discuss Share