Q. The chart which gives an estimate about the amount of materials handling between various work stations stations is known as ?
V
Q. The occurrence of the completion of an activity, is called its ?
K
Q. The optimistic time represents ?
V
Q. The difference between the total float and free float is called ?
R
Q. In the critical path of construction planning, free float can be ?
A
Q. When float or slack of an activity is positive ?
N
Q. The time in which an activity will take to complete in case of difficulty, is called ?