Q. 521) A generating station is to supply four regions of loads with peak demands of 10 MW, 15 MW, 20 MW and 30 MW. If the diversity factor is 1.5 the maximum demand on the station is
M
Q. 522) The permissible pH value of water of boilers is
M
Q. 523) For extinguishing electrical fires
M
Q. 525) A graphical representation of discharge and time is known as
M
Q. 526) The expected life of a GLS lamp is nearly
M
Q. 527) The thickness of the layer of insulation on a cable depends on
M
Q. 528) Coal used in power plants is also known as
M
Q. 529) High horse power diesel engines are usually started by
M
Q. 530) Which of the following motor can operate on lagging as well as leading power factor?
Explore Sets
Explore More Categories
Click on category to learn MCQs of that category.Electronics and Communication Engineering