Q. 261) The process starting with the terminal modules is called

(A) top-down integration
(B) bottom-up integration
(C) none of the above
(D) module integration
View Answer Discuss Share

M

Mr. Dubey • 51.17K Points
Coach

Q. 262) The inputs for developing a test plan are taken from

(A) project plan
(B) business plan
(C) support plan
(D) none of the above
View Answer Discuss Share

M

Mr. Dubey • 51.17K Points
Coach

Q. 263) Function/Test matrix is a type of

(A) interim test report
(B) final test report
(C) project status report
(D) management report
View Answer Discuss Share

M

Mr. Dubey • 51.17K Points
Coach

Q. 264) Which of the following is not White box testing?

(A) structural testing
(B) code-based testing
(C) glass box testing.
(D) closed box testing
View Answer Discuss Share

M

Mr. Dubey • 51.17K Points
Coach

Q. 265) Sandwich/hybrid strategy is---

(A) top down
(B) bottom up
(C) combination of top down & bottom up
(D) none of the above
View Answer Discuss Share

M

Mr. Dubey • 51.17K Points
Coach

Q. 266) System Testing is ----

(A) black box testing
(B) white box testing
(C) smoke testing
(D) both a) and b)
View Answer Discuss Share

M

Mr. Dubey • 51.17K Points
Coach

Q. 267) Which is required skill of a Tester?

(A) good programmer
(B) reliable
(C) attention to details
(D) being diplomatic
View Answer Discuss Share

M

Mr. Dubey • 51.17K Points
Coach

Q. 268) What is the main goal of software testing?

(A) testing
(B) bug prevention
(C) study
(D) execution
View Answer Discuss Share

M

Mr. Dubey • 51.17K Points
Coach

Q. 269) Which of the following is not a level in testing?

(A) system testing
(B) black box testing.
(C) integration testing
(D) functional testing
View Answer Discuss Share

M

Mr. Dubey • 51.17K Points
Coach

Q. 270) Following is not a Software Test Life Cycle Phase.

(A) requirements gathering
(B) test planning
(C) test closure
(D) test design
View Answer Discuss Share