Q. In which of the following contract; contractor tries to complete job quickly?

(A) Item rate contract
(B) Cost plus fixed fee contract
(C) All in one contract
(D) Labour contract
View Answer Discuss Share

M

Mr. Dubey • 52.26K Points
Coach

Q. In which of the following contract; contractor is quickly be agreed and work on job?

(A) Cost plus percentage rate contract
(B) Lump sum contract
(C) Piece work agreement
(D) Labour contract
View Answer Discuss Share

M

Mr. Dubey • 52.26K Points
Coach

Q. In which of the following contract; contractor is not required to deposit SD?

(A) Item rate contract
(B) Lump sum contract
(C) Piece work agreement
(D) Labour contract
View Answer Discuss Share

M

Mr. Dubey • 52.26K Points
Coach

Q. In which of the following contract; contractor is required to offer a fixed sum for job in all respect as per given drawings and details?

(A) Item rate contract
(B) Lump-sum contract
(C) All in one contract
(D) Labor contract
View Answer Discuss Share

M

Mr. Dubey • 52.26K Points
Coach

Q. Extra items will cause headache in item rate contract

(A) Right
(B) Wrong
(C) none
(D) all
View Answer Discuss Share

M

Mr. Dubey • 52.26K Points
Coach

Q. The construction industry has accounted for about ............% of all deaths due to accident at place of work

(A) 5
(B) 20
(C) 25
(D) 30
View Answer Discuss Share

M

Mr. Dubey • 52.26K Points
Coach

Q. For repair works at high level of multistoreyed buildings needle scaffolding is preferred

(A) As it is more stable
(B) As it looks better
(C) As it will not obstruct traffic at ground level.
(D) None of the above
View Answer Discuss Share

M

Mr. Dubey • 52.26K Points
Coach

Q. PPE stands for

(A) Personal protective equipment
(B) Preferred protective equipment
(C) Prohibited protective equipment
(D) None of the above
View Answer Discuss Share

M

Mr. Dubey • 52.26K Points
Coach

Q. For work at height one should use

(A) Safety belt
(B) Full body harness
(C) none
(D) all
View Answer Discuss Share

M

Mr. Dubey • 52.26K Points
Coach

Q. A good safety record can produce higher morale, productivity and stronger employee loyalty.

(A) Right
(B) Wrong
(C) none
(D) all