Q. 171) Which of the following is not a build system feature?

(A) minimal recompilation
(B) documentation generation
(C) storage management
(D) reporting
View Answer Discuss Share

M

Mr. Dubey • 51.17K Points
Coach

Q. 172) Which of the following is a configuration item?

(A) design & test specification
(B) source code
(C) log information
(D) all of the mentioned
View Answer Discuss Share

M

Mr. Dubey • 51.17K Points
Coach

Q. 173) Which of the following is a part of system release?

(A) electronic and paper documentation describing the system
(B) packaging and associated publicity that have been designed for that release
(C) an installation program that is used to help install the system on target hardware
(D) all of the mentioned
View Answer Discuss Share

M

Mr. Dubey • 51.17K Points
Coach

Q. 174) A sequence of baselines representing different versions of a system is known as

(A) system building
(B) mainline
(C) software configuration item(sci)
(D) none of the mentioned
View Answer Discuss Share

M

Mr. Dubey • 51.17K Points
Coach

Q. 175) Process improvement is the set of activities, methods, and transformations that developers use to develop and maintain information systems.

(A) true
(B) false
(C) ---
(D) ---
View Answer Discuss Share

M

Mr. Dubey • 51.17K Points
Coach

Q. 176) How many stages are there in process improvement?

(A) three
(B) four
(C) five
(D) six
View Answer Discuss Share

M

Mr. Dubey • 51.17K Points
Coach

Q. 177) In which stage of process improvement bottlenecks and weaknesses are identified?

(A) process measurement
(B) process analysis
(C) process change
(D) none of the mentioned
View Answer Discuss Share

M

Mr. Dubey • 51.17K Points
Coach

Q. 178) Prototypes and 4GL business systems are categorized under which process?

(A) informal
(B) managed
(C) methodical
(D) supported
View Answer Discuss Share

M

Mr. Dubey • 51.17K Points
Coach

Q. 179) The documentation of a process which records the tasks, the roles and the entities used is called

(A) process metric
(B) process analysis
(C) process modelling
(D) none of the mentioned
View Answer Discuss Share

M

Mr. Dubey • 51.17K Points
Coach

Q. 180) It is always best to start process analysis with a new test model.

(A) true
(B) false
(C) ---
(D) ---
View Answer Discuss Share